Aksa Energy power Generation Plant Installation
SCOPE OF WORKS :
1. Erection of Control Room, Powerhouse 2 & 3 Buildings
2. Installation of Power Generating Engines (12No), Including Piping and Other Associated Equipment
3. Erection/Installation of Powerhouse 1 & 3 Exhaust Ducts and Steel Structure
4. Installation of Engine Room Extractor Fans (38No.) etc
Aksa Energy power Generation Plant Installation
Client
Aska
Date
June 2020
Category
Construction
Other Projects

Aksa Energy power Generation Plant Installation
Power Generation Plant Installation

BULK OIL STORAGE AND TRANSPORTATION COMPANY LIMITED
Extension of two new 8 inches pipelines from AT&V tank to oil JETTY and repair of BOST 1 & 2, Painting of BOST 3 & 4 and TUG boat at Volta Lake Transport Company and Akosombo Depot.

Rehabilitation Of Haatso Puma Filling Station
Rehabilitation Of Haatso Puma Filling Station

Aksa Energy power Generation Plant Installation
Power Generation Plant Installation

















